131 SAN QUIRINO MUNICIPAL LIBRARY

place: San Quirino (PN)
stazione appaltante: Comune di San Quirino
assignment: competition
architects: arch. Ado Furlan, arch. Vittorio Pierini
collaborators: arch. Gianluca Zanette
project cost: €. 230.000,00
services supplied: project, executive project, construction management, safety coordination
project: 2010/2011
construction: 2011/2012
photography: Foto Ciol

The project involves the architectural and plant renovation of a building built in the 1920s to house the city library. The building was already the subject of an intervention in the 1980s; it was radically modified both in function – originally it was the dwelling of the doctor, then it was used as medical clinics – and in the typology, with an extension on the east side and the new positioning of the stairwell. The two floors have been completely freed from the existing internal walls: the ground floor, which has become an open-space, is intended for public acceptance, book storage and reading room; the first floor has been divided into three rooms: two for children and adults, and the third for a multi-purpose room. The program also required the creation of a new multimedia environment; since it did not find its place in the existing building, an expansion was built on the south side, towards the garden.

117B SAN MARTINO DI CAMPAGNA SQUARE

place: San Martino di Campagna
contracting authority: Comune di Aviano (PN)
assignment: competition
architects: arch. Ado Furlan, arch. Vittorio Pierini architetti (coordinator), arch. Giorgio del Fabbro, ing. Gianni Mirolo, arch. Gianluca Zanette
project cost: €. 669.520,00
services supplied: project, executive project, construction management, safety coordination
project: 2009/2010
construction: 2010/2012
photography: furlan&pierini architetti

The main generating elements of the project, that accepts and makes the orography of the place its own, taking it as a reference for the new urban design, are the natural elements (the trees) and built elements (the fountain and the war memorial). It was decided to keep them in their original location, along with the facade of the church. The layout of the square is organized according to a geometric grid that becomes the matrix of the entire project, built on the pitch of the main elements present in the public space.